Baseline optimism / strategic presentation
Favourable baseline assumptions or presentation are recorded only where supported by inquiry, audit, regulatory, or equivalent documentary evidence.
Pattern explorer · Seed sample
See where each documentary signal appears, read its definition, and move directly into the project record.
CODE PRESENCE ≠ SINGLE-CAUSE ATTRIBUTION
Favourable baseline assumptions or presentation are recorded only where supported by inquiry, audit, regulatory, or equivalent documentary evidence.
Documented productivity deterioration, capability gaps, disrupted work fronts, or related delivery losses.
Ground, site, or subsurface conditions materially differed from the knowledge available to the project baseline.
Documented defects, non-conformance, remediation, or rework affected delivery.
Documented pandemic impacts affected labour, supply chains, access, schedule, or cost.
Rights, jurisdiction, consultation, accommodation, or litigation are recorded as project-definition and legitimacy questions, never as a generic delay cause.
Owner capability, assurance, accountability, escalation, or decision rights were documented as material to performance.
Claims, disputes, or adversarial commercial conditions are recorded separately from their upstream causes.
Labour availability, industrial relations, or work stoppages materially affected delivery.
Weather or natural hazards materially affected work, access, safety, schedule, or cost.
Interfaces, configuration, software, testing, or commissioning affected readiness or reliable operation.
Materials, equipment, logistics, or supplier performance materially affected delivery.
Regulatory review, permitting, approvals, or compliance obligations materially shaped the project.
Scope evolution, immature definition, or design change materially affected delivery and is traced to its upstream conditions.
Favourable baseline assumptions or presentation are recorded only where supported by inquiry, audit, regulatory, or equivalent documentary evidence.
Documented productivity deterioration, capability gaps, disrupted work fronts, or related delivery losses.
Ground, site, or subsurface conditions materially differed from the knowledge available to the project baseline.
Documented defects, non-conformance, remediation, or rework affected delivery.
Documented pandemic impacts affected labour, supply chains, access, schedule, or cost.
Rights, jurisdiction, consultation, accommodation, or litigation are recorded as project-definition and legitimacy questions, never as a generic delay cause.
Owner capability, assurance, accountability, escalation, or decision rights were documented as material to performance.
Claims, disputes, or adversarial commercial conditions are recorded separately from their upstream causes.
Labour availability, industrial relations, or work stoppages materially affected delivery.
Weather or natural hazards materially affected work, access, safety, schedule, or cost.
Interfaces, configuration, software, testing, or commissioning affected readiness or reliable operation.
Materials, equipment, logistics, or supplier performance materially affected delivery.
Regulatory review, permitting, approvals, or compliance obligations materially shaped the project.
Scope evolution, immature definition, or design change materially affected delivery and is traced to its upstream conditions.